ISSUE-006

Gate enclosure

Open  •  Generated: 2026-02-04 05:27
Type
Date Raised
Date Due
Status
Open
Description
The top of the upper storey gate enclosure is incomplete, with missing cover pieces to the corner and wall return. The existing left-hand cover is hand-cut and poorly finished.
Remediation Required
Provide properly fabricated cover trims to fully enclose the top, corner, and wall return, achieving a consistent and acceptable finish.
XYZ Proposal / Response
Replace. XYZ to fabricate and advise on shipping date
Photos
(None)

Documents
(None)

WeChat
(None)